- Jul 24, 2024
-
-
- Jun 19, 2024
-
-
- Use latest STS, TRD and TOF geometries - Switch to TRD v24e as default, refs #3280 - Use mRICH v24a in setup, Shift RICH upstream in z by 12 cm, following the TOF mainframe, refs #3302
-
Add new STS geometry v24c, shift of STS in Z direction/axis as per the measurement in the CAVE, provided by Mehulkumar Shiroya Made reproducible
-
- Add new geometry v24d for fully read-out TRD2D - Fix a typo in the comments section v24c -> v24d - v24e: shifting the TRD1D downstream module by 3 cm in -x direction relative to v24d - Remove TRD v24d as not used for data written on disk - Made reproducible
-
- Introduce TOF geometry macro provided by Ingo Deppner - Add TOF v24d geometry binaries, provided by Ingo Deppner - In TOF v24d, fix Z position of odd and even RPCs in module type 0 (17-18/06/2024) - Made reproducible
-
Made reproducible
-
- Apr 24, 2024
-
-
- Apr 22, 2024
-
-
Eoin Clerkin authored
Changes default macros to output reproducible binaries. Provides psd_v24f which coincides with pipe_v21f and fsd_v23f, i.e. no magnetic field.
-
- Apr 12, 2024
-
-
- Apr 11, 2024
-
-
Remove left member. Reorder some responsible persons.
-
- Mar 27, 2024
-
-
David Emschermann authored
-
-
=> Also add TRD v24a creation macro, provided by Axel Puntke => Root file not added/removed as known not matching reality
-
-
=> Also add mTOF v24a creation macro (original from TOF experts) => Root file not added/removed as known not matching reality
-
- Feb 05, 2024
-
-
Converges to CAD and its material budget. Updates to beampipe tunnel, entrance and exit windows, mirror supports and its structs and connectors, and rich container frame.
-
- Jan 31, 2024
-
-
Set the TRD and MUCH for the 2022_03_28_uranium and 2022_05_23_nickel setups to inactive.
-
- Jan 29, 2024
-
-
Correct and make clear information in the info files of previous generated v23 trd binaries.
-
- Dec 22, 2023
-
-
Eoin Clerkin authored
changes the default lmvm much from v23a to v20c as per discussion in https://redmine.cbm.gsi.de/issues/3135
-
- Dec 18, 2023
-
-
TRD2D for the electron, hadron, muon setups. Compliant with 1-day layout.
-
- Nov 27, 2023
-
-
Eoin Clerkin authored
Edit miscalculated acceptance angles to highlight that they are from the centre of the magnet.
-
- Nov 21, 2023
-
-
Eoin Clerkin authored
-
Eoin Clerkin authored
For 10 AGeV Au beam (11 AGeV/c), relates with pipe_v21i Make default in electron setup
-
- Nov 17, 2023
-
-
Eoin Clerkin authored
output for record and checking. Small change to exisitng macro.
-
- Nov 08, 2023
-
-
Eoin Clerkin authored
More realistic material budget
-
Eoin Clerkin authored
Update sis100_muon_lmvm setup.
-
- Nov 06, 2023
-
-
-
Incremental improved geometry. Readout shape corrected for stations 1 and 2 now with steel supports. FR4 material for edge frame, readout and drift. Al support with hole for PCBs.
-
- Oct 12, 2023
-
-
Eoin Clerkin authored
-
- Oct 10, 2023
-
-
Eoin Clerkin authored
-
Eoin Clerkin authored
change to the electron setup.
-
- Oct 05, 2023
-
-
Three FSD geometries which are consistent with current beampipes design following same energies.
-
- Jul 25, 2023
-
-
Pierre-Alain Loizeau authored
-
Pierre-Alain Loizeau authored
-
Add the TRD Day-1 Geometry (v20b without grayed out modules in linked presentation) as requested in redmine issue https://redmine.cbm.gsi.de/issues/2888.
-
- Jun 27, 2023
-
-
Pierre-Alain Loizeau authored
-
- Jun 21, 2023
-
-
To be checked with experts if details needed, here is extrapolated from diff to v21h/v21i - Shift front forward by 14 cm - Shift front stand toward negative X by 50 cm (compensated in other place) - Double readout strips in SM Type 4 (diamond/BMon) from 8 to 16 - Shift modules start position in SM type 2 by 6 cm toward positive X - Increase distance in X between modules in SM type 0 and 2 by 0.7 cm - Fine-tuning of each SM position, includes compensation for X shift of front position\ => At leats shift of +1.5 cm in Y of each, but also more changes for some types - Include fix for radiation length error, should be base of further mCBM geometries!!!
-
- Jun 14, 2023
-
-
** 2023-02-09 - DE - v22f: - decrease distance between statios 0 and 1 from 140 mm to 135 mm, to reflect CAD - increase gap between units of a station gkLadderGapZ from 10 mm to 12 mm, to reflect CAD - shift ladder U2 downwards in y by 2.2 mm ** 2023-02-08 - DE - v22f: - introduce ladder type 12 (based on 10) for U2, but with original gkSectorOverlapY of 4.6 mm, linked to specificity in mSTS production compared to full STS
-
- May 09, 2023
-
-
Vikas Singhal authored
new mcbm setup created for High Rate Gold Runs of 18/06/22 to 20/06/2022 in which GEMs are in acceptance.
-
- May 03, 2023
-
-
Mehulkumar Shiroya authored
This is Block STS variant v22d. Aditionally it has Cooling pipes, LV cables(Sumida cables), HV cables(Habia cables), Optical fibre cable box, Power cable box(LV and HV cables), cooling tubes(Perforated tubes) along to the central ladders.
-