- Jun 18, 2024
-
-
Pierre-Alain Loizeau authored
-
- May 07, 2024
-
-
David Emschermann authored
-
- May 03, 2024
-
-
David Emschermann authored
-
David Emschermann authored
Add TRD v24e geometry binary, shifting the TRD1D downstream module by 3 cm in -x direction, refs #3282
-
David Emschermann authored
-
David Emschermann authored
-
- Apr 30, 2024
-
-
David Emschermann authored
-
David Emschermann authored
-
David Emschermann authored
Add new STS geometry v24c, shift of STS in Z direction/axis as per the measurement in the CAVE, provided by Mehulkumar Shiroya
-
David Emschermann authored
-
David Emschermann authored
-
David Emschermann authored
-
- Apr 22, 2024
-
-
Eoin Clerkin authored
Changes default macros to output reproducible binaries. Provides psd_v24f which coincides with pipe_v21f and fsd_v23f, i.e. no magnetic field.
-
- Apr 12, 2024
-
-
- Apr 11, 2024
-
-
Remove left member. Reorder some responsible persons.
-
- Mar 27, 2024
-
-
David Emschermann authored
-
-
=> Also add TRD v24a creation macro, provided by Axel Puntke => Root file not added/removed as known not matching reality
-
-
=> Also add mTOF v24a creation macro (original from TOF experts) => Root file not added/removed as known not matching reality
-
- Feb 05, 2024
-
-
Converges to CAD and its material budget. Updates to beampipe tunnel, entrance and exit windows, mirror supports and its structs and connectors, and rich container frame.
-
- Jan 31, 2024
-
-
Set the TRD and MUCH for the 2022_03_28_uranium and 2022_05_23_nickel setups to inactive.
-
- Jan 29, 2024
-
-
Correct and make clear information in the info files of previous generated v23 trd binaries.
-
- Dec 22, 2023
-
-
Eoin Clerkin authored
changes the default lmvm much from v23a to v20c as per discussion in https://redmine.cbm.gsi.de/issues/3135
-
- Dec 18, 2023
-
-
TRD2D for the electron, hadron, muon setups. Compliant with 1-day layout.
-
- Nov 27, 2023
-
-
Eoin Clerkin authored
Edit miscalculated acceptance angles to highlight that they are from the centre of the magnet.
-
- Nov 21, 2023
-
-
Eoin Clerkin authored
-
Eoin Clerkin authored
For 10 AGeV Au beam (11 AGeV/c), relates with pipe_v21i Make default in electron setup
-
- Nov 17, 2023
-
-
Eoin Clerkin authored
output for record and checking. Small change to exisitng macro.
-
- Nov 08, 2023
-
-
Eoin Clerkin authored
More realistic material budget
-
Eoin Clerkin authored
Update sis100_muon_lmvm setup.
-
- Nov 06, 2023
-
-
-
Incremental improved geometry. Readout shape corrected for stations 1 and 2 now with steel supports. FR4 material for edge frame, readout and drift. Al support with hole for PCBs.
-
- Oct 12, 2023
-
-
Eoin Clerkin authored
-
- Oct 10, 2023
-
-
Eoin Clerkin authored
-
Eoin Clerkin authored
change to the electron setup.
-
- Oct 05, 2023
-
-
Three FSD geometries which are consistent with current beampipes design following same energies.
-
- Jul 25, 2023
-
-
Pierre-Alain Loizeau authored
-
Pierre-Alain Loizeau authored
-
Add the TRD Day-1 Geometry (v20b without grayed out modules in linked presentation) as requested in redmine issue https://redmine.cbm.gsi.de/issues/2888.
-