- Nov 18, 2021
-
-
Shreya Roy authored
-
- Nov 17, 2021
-
-
-
Alexandru Bercuci authored
-
Alexandru Bercuci authored
-
Alexandru Bercuci authored
-
Alexandru Bercuci authored
-
Alexandru Bercuci authored
-
- Nov 16, 2021
-
-
Administrator authored
The macro loops over the branches contained in the input file and reports the sizes of the differnt branches. The output is a table written to cout. The table is sorted from smallest to largest sizes.
-
- Nov 15, 2021
-
-
Alexandru Bercuci authored
-
David Emschermann authored
-
David Emschermann authored
-
- Nov 14, 2021
-
-
Semen Lebedev authored
-
Semen Lebedev authored
-
- Nov 12, 2021
-
-
Administrator authored
-
Administrator authored
Before the change it was necessary to define an environment variable to switch between different test suites like for example the Experimental or Nightly tests. Now the test suites are chosen by the CMake command line parameter CBM_TEST_MODEL. These are Experimental, Nightly and Weekly which differ by the number of executed tests.
-
David Emschermann authored
change geometry tag and parameter tag fixing the TRD-2D overlaps in TRD v22a and TRD v22b, refs #2297
-
David Emschermann authored
enable check for overlaps in v2[0-2]? macros and fix TRD-2D overlaps in TRD v22a and TRD v22b, refs #2297
-
- Nov 11, 2021
-
-
-
v21a has stations with extended pitch, uses the old beam pipe, repositions the FEB boxes, and changes the material(Airex) for foam in sts wall. v21b has stations with extended pitch, repositioned central ladders according to 40 mm diameter beam pipe and new material(Airex) for foam in STS wall. New nomenclature has been applied to halfladders from up(u) to top(t) and down(b) to bottom(b). v21c has stations with extended pitch, repositioned central ladders according to 55 mm diameter beam pipe and new matrial(Airex) for foam in STS wall foam v21d has stations with extended pitch, repositioned central ladders due to provision for a 40 mm diameter beam pipe. The back side wall has a honeycomb structure Airex matrial used v21e has the centre of the magnet along the beam line as the global origin point. Additionally the local sts origin (x=0, y= 0, z= 0) is taken as the centre of the last sts station along the nominal beam axis. New Nomenclature has been applied to halfladders from up(u) to top(t) and down(d) to bottom(b). The central ladders are moved upward (y-direction) due to the conical beam pipe with 40 mm diameter upstream side and 100 mm diameter in downstream side. STS geometries without beampipe flange. Old material(Silicon) and thickness of micro-cable.
-
- Nov 10, 2021
-
-
Semen Lebedev authored
-
- Nov 08, 2021
-
-
Pierre-Alain Loizeau authored
-
Pierre-Alain Loizeau authored
-
Pierre-Alain Loizeau authored
Change setups for CI testing suite of mcbm simulation to current/future ones. Legacy ones kept in Nightly/weekly tests
-
- Nov 05, 2021
-
-
Alexandru Bercuci authored
-
Alexandru Bercuci authored
-
Alexandru Bercuci authored
-
Dominik Smith authored
-
- Nov 04, 2021
- Nov 03, 2021
-
-
alberica.toia@cern.ch authored
changed mcbm2021 Par for mapping and addressing, including invalid add. for pulser Feb, also in 2020
-
- Nov 02, 2021
-
-
Sergey Gorbunov authored
-
- Nov 01, 2021
-
-
David Emschermann authored
-
- Oct 28, 2021
-
-
cbm authored
-
- Oct 26, 2021
-
-
David Emschermann authored
-
Dario Ramirez authored
-
- Oct 25, 2021
-
-
David Emschermann authored
-
Shreya Roy authored
-
Shreya Roy authored
-
-
Pierre-Alain Loizeau authored
-
Pierre-Alain Loizeau authored
-