Skip to content
  • Mehulkumar Shiroya's avatar
    WIP: New STS geometries · ddce789f
    Mehulkumar Shiroya authored
    v21a has stations with extended pitch, uses the old beam pipe, repositions the FEB boxes, and changes the material(Airex) for foam in sts wall.
    v21b has stations with the extended pitch, repositioned central ladders according to 40 mm diameter beam pipe and new material(Airex) for foam in STS wall.
    v21c has stations with extended pitch, repositioned central ladders according to 55 mm diameter beam pipe and new matrial(Airex) for foam in STS wall foam
    v21d has stations with extended pitch, reposition of central ladders due to provision for a 40 mm diameter beam pipe. The back side wall has a honeycomb structure Airex matrial used
    
    New Beam_pipe geometries
    
    v21a It contains old beam pipe, thickness 1 mm, and moved towards upstream side where target is positined at -4 cm.
    v21b It contains new beam pipe of 40 mm diameter in upstream side and 100 mm in downstream side, thickness 1 mm moved towards -4 cm.
    v21c It contains new beam pipe of 55 mm diameter in upstream side and 100 mm in downstream side, thickness 1 mm moved towards -4 cm.
    
    Run transport.C
    
    target is positioned at -4 cm.
    
    New sts geometries
    ddce789f