- 23 Nov, 2021 2 commits
-
-
-
STS geo v21f: This geometry has a target position -4 cm and last station at 99.5 cm. STS geo v21g: This geometry has a target position at -44 cm from the center of the magnet. The material budget files are produced for both geometry version to merge them in the cbmroot.
-
- 18 Nov, 2021 1 commit
-
-
Alexandru Bercuci authored
-
- 17 Nov, 2021 5 commits
-
-
David Emschermann authored
-
David Emschermann authored
-
-
Florian Uhlig authored
Remove additional spaces between the directory name and the code owners
-
Alexandru Bercuci authored
-
- 15 Nov, 2021 1 commit
-
-
Alexandru Bercuci authored
-
- 12 Nov, 2021 2 commits
-
-
Material budget files for the five geometries v21[a-e].
-
David Emschermann authored
-
- 05 Nov, 2021 3 commits
-
-
Alexandru Bercuci authored
-
Administrator authored
-
Administrator authored
Inform responsible persons about merge requests in their directories.
-
- 19 Oct, 2021 1 commit
-
-
David Emschermann authored
-
- 18 Oct, 2021 1 commit
-
-
Alexandru Bercuci authored
-
- 14 Oct, 2021 1 commit
-
-
Alexandru Bercuci authored
mCBM setup
-
- 08 Oct, 2021 1 commit
-
-
Alexandru Bercuci authored
setup_mcbm_beam_2021_07_surveyed. The files are a rename of the v20a_mcbm tag
-
- 07 Sep, 2021 1 commit
-
-
Norbert Herrmann authored
-
- 01 Sep, 2021 1 commit
-
-
Alexandru Bercuci authored
2021
-
- 30 Jun, 2021 1 commit
-
-
Pascal Raisig authored
This is a manual patch. The files allow reading data from all 3 eq_ids, i.e. the 2 1D chambers and the 2D chamber with the Spadic mounted. The position mapping should be correct for the 2 1D chambers, to be checked though. For the 2D chamber it is most probably wrong. A correct positioning, i.e. x-/y-positions in the mCBM coordinate system, requires a full geometry, which is not yet available.
-
- 23 Jun, 2021 2 commits
-
-
Up to now the histo representing a drifttime map for the 1D TRD modules is stored in FeatureExtractionLookup.root. Yet to come updates/upgrades of the 1D digitizer part will use the new separated file. As soon as they superseded the current implementation the drifttime map histo will be removed from the FeatureExtractionLookup file.
-
Pascal Raisig authored
Remark further updates still to come when the equipment ids are finally fixed.
-
- 21 Apr, 2021 2 commits
-
-
This was previously replaced by a symbolic link to the 19a version, leading to missmatching residuals and Z positions after reconstruction.
-
Valentina Akishina authored
-
- 20 Apr, 2021 2 commits
-
-
Administrator authored
-
Administrator authored
Fix the stage for the rebase check. After the upgrade it looks like that the pipeline doesn't run any longer in the context of the forked project but in context of the master project such that the project path wasn't correct any longer. This allows now to compare upstream/master to HEAD.
-
- 13 Apr, 2021 2 commits
- 18 Mar, 2021 1 commit
-
-
Administrator authored
-
- 01 Mar, 2021 1 commit
-
-
Pascal Raisig authored
-
- 22 Jan, 2021 2 commits
-
-
Administrator authored
-
Administrator authored
We don't want to have files with dos CRLF line endings in the repository, so we test if any of the changed files has this file type.
-
- 11 Jan, 2021 7 commits
-
-
Pascal Raisig authored
run 831 parameters, others to follow soon
-
Pascal Raisig authored
-
-
Pascal Raisig authored
-
Pascal Raisig authored
-
Pascal Raisig authored
-
Pascal Raisig authored
-